Industrial 5000 Kw Fire Tube Water Boiler Sale
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
The off-gas at a rate of 66,000 Nm3/h leaves the afterburner chamber at a temperature of 1000°C. Heat is recovered in a steam boiler. The gases leave the boiler at 270°C. Steam is generated at 25 atm and superheated to 250°C at a rate of 34 t/h. A steam turbine generates electric power at the rate of 1320 kw/h consuming 22 t/h steam.Get Price
A good precaution is to install two valves in series to protect the CO on of check valves. •a c o o m _> 8 boiler from .sludge backing up into boiler tubes. Use temperature readouts or gauges. . ' ' •*' * • sludge temperature o 'E 0 "*' Water temperature above 130 deg. F. (54 deg. C.) will cause sludge to bake on tube and cut down heat Get Price
Description of Steam Power Plant: Basic Steam Plant consists of a: a. Boiler b. Steam Turbine c. Condenser d. Feed pump e. Economizer f. Pre-heater 3.1 Boiler: The purpose of the boiler is to convert water (pumped into it under pressure) to steam. The steam may emerge wet, dry saturated, or superheated depending on the boiler design.Get Price
~ gas room heater for external wall Paper formats change of cross-section Technical)( (stating nominal diameter) connection (stating connection appliance capacity volume flow capacity) (kW) (m 3/h) drawings rn'ln Layout of gas water 8.8-28.1 1.14-3.62 drawings gas pipe house entry heater Construction gas heating boiler circulating 9.5-28.4 1.23 Get Price
Jul 01, 2021 · For a heating process, the boiler or solar collectors will be used to supply heat to the water circulation, while a cooling tower is used to …Get Price